Schedule a look at the roof. We will explain the options, the full cost with access included and what the building needs to decide.
Other services, systems and conditions Glendale owners often review alongside this one.
The product and system from records and the roof itself, including any later coatings. A separate roof section may need its own material decision.
The finished edge needs solid support. We measure the condition and height behind the metal and include rebuilding when the repair needs it.
We compare the unit's size with the curb and finished roof height. The HVAC contractor sets support and operation, and we agree on the flashing and timing before the unit is placed.
Wet insulation or deck damage, plus edge, drain and curb changes caused by a thicker roof. Testing and measurements are matched to the option.
Its location, the proposed fix, and the change in quantity and price for approval. Approved changes are kept with the finished-work record.