Tell us about the building and the work planned. We will explain the permanent repair, the full cost and the operator decisions needed to schedule it.
Other services, systems and conditions Glendale owners often review alongside this one.
We locate the problem on a drawing or grid and measure to sound material where the repair will end. Any removal or deck repair needed is included, so the cost matches the finished repair.
The operator approves separation and FOD control. We describe where material and debris will go and name the contact who can change the plan if activity shifts.
Curb height and clearance affect whether the roof can be flashed properly. The engineer sets supports, and we settle the curb detail while the location can still change.
We install temporary protection and assign who maintains it. The operator approves shutdowns, and our permanent flashing follows once the equipment work is done.
Approved photos and drawings of finished details, installed products and approved changes, plus open door, wall or equipment items with a responsible contact.